View Single Post
  #37  
Old 28-03-2009, 04:20 AM
sykdevil sykdevil is offline
Samster (M)
 
Join Date: Dec 2005
Posts: 4
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
My Reputation: Points: 10 / Power: 0
sykdevil deserves a Tiger! - He's a Good Guy
Re: first time to bangkok

Quote:
Originally Posted by mekongcatfish View Post
The construction of the City Airport Terminal in Makkasan and the 29 km of high speed rail link (airport Express) is still on going...only on a slow pace. This line will be known as the Pink line and will connect BTS Sukhumvit and MRT Phaya Thai and Phetchaburi respectively.
i see them testing the trains the past 2-3 months, but the main station down at sukhumvit, I believe its asoke station is still underconstruction, not close to being done yet.